 |
Direct access |
|
|
|
|
|
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
Contact:
| |
INTI
Parque Tecnológico Miguelete
Av. Gral. Paz e/Albarellos y Constituyentes (B1650KNA)
C.C. 157 - (B1650WAB) San Martín, Prov. Buenos Aires
Tel.: + 54 11 4724 6200/6300/6400
Fax: + 54 11 4724 6244
Web: http://www.inti.gov.ar/
|
|
|
|
|
The CIPM MRA was signed on:
14 October 1999
by: Joaquin VALDÉS (INTI)
|
|
|
Signatory NMI:
Instituto Nacional de Tecnología Industrial
(INTI), San Martín, Prov. Buenos Aires
 Designated institute(s):
National Commission of Atomic Energy
(CNEA), Buenos Aires
|
|
Search for calibration and measurement capabilities (CMCs) in the following fields declared in Appendix C of the CIPM MRA:
|
 |
|
 |
 |
|
 |